Laying and grouting natural stone: STONE NV's installation guidelines

Laying and grouting natural stone: STONE NV's installation guidelines

Natural stone installed outdoors, indoors, in a bathroom and as facade cladding

 

Natural stone lasts for generations, provided it is laid and grouted correctly. Most problems, such as cracks, damp stains, cement haze or loose tiles, are not caused by the stone itself, but by an incorrect build-up or installation. In this guide, STONE NV sets out the key rules from its general installation guidelines, for contractors, tilers, architects and clients across Europe, the United States and the Middle East.

Please note: these are general guidelines. Certain stones and situations (some marbles, slate, large formats, underfloor heating) have specific requirements. Always consult the technical data sheet for the material and install according to good workmanship and local building standards (in Belgium, for example, the WTCB/Buildwise technical notes TV 137, TV 213 and TV 276).

1. Preparation on site

  • Bring the tiles indoors straight after delivery, or protect them well against rain, wind and frost.
  • The room where they will be laid must be protected from rain, frost and draughts, with no damp floor or walls.
  • The screed must be laid at least 28 days before installation. Allow a drying time of 1 week per cm of thickness + 1 week (so a 7 cm screed needs 8 weeks).

2. Check the tiles before installation

Installation means acceptance: once laid, no complaints can be accepted, except for hidden defects. So check the dry tiles in advance, together with the client or architect, for any differences from the samples. Report damaged or broken tiles before installation and, where possible, use them along the walls or for cuts. Mix tiles from different boxes or pallets for an even spread of colours. Bear in mind that natural stone can have larger dimensional tolerances than ceramics.

3. Laying natural stone indoors

There are two methods: traditional laying in a mortar bed, or bonding onto a dry screed.

  • Damp-proof layer: lay a double polyethylene sheet between the concrete structure and the sand bed or screed, turned up to the skirting. A single sheet under the concrete slab is not enough.
  • Traditional method: on a stabilised sand bed of max. 5 cm (washed river sand and white cement, 9 parts sand to 1 part cement), with a bedding mortar of max. 1.5 to 3 cm or a white ready-mixed bedding mortar for natural stone. The tiles are laid on a full bed of mortar.
  • Bonded onto a dry screed: required for calibrated tiles and recommended for organoclastic limestones such as Belgian bluestone. Use a special white flexible adhesive for natural stone and always apply double bonding: fully coat both the back of the tile and the substrate.
  • White marbles, slate and quartzite: with the traditional method, the back of the tiles is treated beforehand as described in the technical data sheet. Not every stone suits every method.
  • Do not wet: don't wet the tiles before installation, and don't spray them after laying.
  • Expansion joints: from 50 m² or a length of more than 8 m, provide an expansion joint through the sand bed or screed and the bedding mortar, and always a perimeter joint along the walls.

4. Natural stone on underfloor heating

  • Lay only with a white flexible adhesive or a white ready-mixed bedding mortar for natural stone, on a dry screed, and strictly follow the supplier's instructions.
  • Include a stainless reinforcement mesh in the screed and preferably work with straight joints.
  • Before installation, start the heating gradually for the first time (5 °C per 24 hours), around 28 days after the screed is laid. Let it run for 3 to 7 days at maximum temperature, bring it back down gradually, and lay the natural stone only one day later.
  • Don't cover the floor with sheets or vapour-tight materials while it dries: moisture must be able to evaporate through the stone.

5. Laying natural stone outdoors: terrace and driveway

Outdoors, good drainage is the most important thing. The total build-up under the tile must be at least 40 cm, down to below the frost line.

  • On a draining concrete layer (recommended): a well-compacted hardcore layer of 20 to 30 cm, about 15 cm of no-fines (draining) concrete, a stabilised sand bed of about 5 cm and a bedding mortar of max. 3 cm. The tiles are laid on a full bed of mortar, not on dabs.
  • On existing concrete: preferably avoid it, as water stays on concrete and the terrace can freeze. If you have to, first lay a drainage mat, then continue with a reinforced screed of at least 5 cm, or with the traditional method.
  • On pedestals: for roof terraces and balconies, or terraces without vehicle traffic. The natural stone must then be at least 3 cm thick, depending on the stone and the format.
  • Fall: lay the terrace with a fall of at least 1.5%, away from the building.
  • Expansion joints: depending on colour and sun exposure. Dark shades in the sun need an expansion joint from 25 m² or 5 m in length; light shades in the shade only from 36 m² or 10 m. Always provide a flexible joint against the facade.

Read more about suitable materials on our natural stone and ceramic terraces page.

6. Grouting: width, mortar and timing

  • Joint width indoors: 4 to 6 mm, depending on the format and type of stone. For slate, quartzite, sandstone and aged stones, the joint is wider (0.5 to 1 cm).
  • Joint width outdoors: 5 to 12 mm, depending on the material.
  • Grout: use a grout for natural stone, not a home-made mix of sand and cement.
  • Timing: leave the joints open for a few days after laying (at least 14 days in damp conditions), so moisture can evaporate. Clean the tiles thoroughly and dampen them lightly before grouting.
  • Prevent cement haze: clean the tiles repeatedly while grouting, so no cement haze is left behind. If a haze does need removing, use only an acid-free product on limestone. More on this in our article on cleaning and caring for natural stone.

7. Handover

Never judge a natural stone floor against the light or in raking light, but at eye level and with the naked eye. Colour differences can only be judged on dry tiles. For an indoor floor, provide an entrance mat: grains of sand under shoes are highly abrasive.

Need a technical data sheet or advice?

For every material we can provide the technical data sheet, with the specific installation method, joint width and thickness. Unsure about the build-up for your project? Contact our workshop or see our price list, which includes the full installation guidelines.

Frequently asked questions about laying and grouting natural stone

How wide should the joints be for natural stone?

Indoors 4 to 6 mm, depending on the format and type of stone; for slate, quartzite and aged stones 0.5 to 1 cm. Outdoors 5 to 12 mm. Always consult the material's technical data sheet.

How long must a screed dry before laying natural stone?

Allow 1 week per cm of thickness plus 1 week. A 7 cm screed therefore needs about 8 weeks to dry.

Can natural stone be laid on underfloor heating?

Yes, with a white flexible adhesive or bedding mortar for natural stone on a dry screed, a reinforcement mesh and a correct heating start-up procedure before installation.

When is an expansion joint needed?

Indoors from 50 m² or 8 m in length, and always along the walls. Outdoors it depends on colour and sun exposure: for dark shades in the sun, from 25 m² or 5 m in length.

Can natural stone be laid outdoors on concrete?

Preferably not: water stays on concrete and the terrace can freeze. A draining concrete layer is better. If you have to, first lay a drainage mat.

Should natural stone be wetted before laying?

No. Natural stone is not wetted before installation, nor sprayed after laying. Only just before grouting are the cleaned tiles lightly dampened.